Day 11 June 4, 2010







All sheetrock in the cellar has been moved to the outside backyard, to allow for he extra work Building Dept, is requiring of us to increase the cellar fire exit corridor head height to 7' - 6" for 75% of the space. Danny and I visted United Rental on 44th St. to price a walk behind concrete saw, possible to be used to cut the basement slab to gain the extra inches needed in head height.
All rudy's debris in backyard has been removed along with the dirt from the exccavation which was placed in plastic bags a hand carried to the front of the building for pickup.