Thursday, May 27, 2010

Day 6 May 27, 2010







Half of the 3" x 10" original wood joists in the new fire egress in the cellar, have been "sistered", bolted with the 16 gauge 2" x 8" C channels. Chipping the existing CMS walls in the backyard is still under demolition, with probe holes being dug for the structural engineer. Three vans full of debris were removed from the backyard today.